← All SWMS

Construction SWMS

Wet Area Membrane SWMS

Internal wet-area membrane with bond breakers, junction detailing and a flood-test hold point.

✓ Editable Microsoft Word✓ Instant download after payment✓ State-specific WHS Regulation

What this SWMS covers

  • Internal wet-area membrane application
  • Bond breakers, junctions and penetrations
  • Flood-test hold point before tiling
  • Ventilation and slip control in confined bathrooms

How it works

  1. Pick your state — the document is written to the WHS Regulation in force there.
  2. Pay once — card checkout, no account, no subscription.
  3. Download & edit — the Word file is emailed and downloadable straight away. Add your ABN, site and crew, brief the team, and you’re ready.

What you get

A complete, editable Safe Work Method Statement for wet area membrane, in Microsoft Word — not a locked PDF. It sets out the activity, its hazards and the control measures, ready for you to add your site-specific detail before work starts. Available for all 8 states you can select at checkout. It remains a template until you complete it and consult your workers, as the WHS Regulation requires.